HAUSSMANN

HAUSSMANN

PARIS, 8e arr.
THINKING THROUGH THE TRANSITION BETWEEN ERAS, FROM BANK TO WORKSPACE
DESIGN | Offices & Services
Project architect, design phase
2023
5
DESIGN
OFFICES WITH SERVICES | BUILDING PERMIT OBTAINED IN 2023
R+6 building, glass roof over atrium, agricultural greenhouse, roof terrace | 11,350 m²
Major restructuring
Code compliance upgrades
Listed heritage elements
Urban agriculture

CLIENT

UNION INVESTMENT REAL ESTATE Client
OGIC Corporate real estate developer

DESIGN TEAM

ARTQAD ARCHITECTS | Architect and interior architect
DAL | Cost consultant and specification writer
GÉCIBA | Structural engineering consultant
ASCAUDIT | Mechanical and electrical engineering consultant, elevator consultant
CAPRI ACOUSTIQUE | Acoustic engineering consultant
UPSOS | Facade / glass roof engineering consultant
CONCEPT CUISINE | Kitchen engineering consultant
MUGO | Landscape architect
OASIIS | Environmental project assistant
BTP CONSULTANTS | Technical controller, health and safety coordinator
STUDIO FAHRENHEIT | Fire-safety consultant

THINKING THROUGH THE TRANSITION BETWEEN ERAS, FROM BANK TO WORKSPACE

The project consists of the rehabilitation of a prestigious building on Boulevard Haussmann, the historic headquarters of Crédit du Nord. It aims to improve user comfort through the complete renovation of the office spaces and the integration of new services, while displaying a high level of ambition in environmental and energy performance (BBC, HQE, R2S). The project's focal point will be the creation of an agricultural greenhouse on R+6 and open-air agricultural surfaces on the roof terrace.


A glazed facade over two levels was designed for this purpose, including the light, thermal, and hygrometric control required for crop development. On the lower floors, the major transformations will be the replacement of the existing glass roof over the atrium, the creation of a glass floor between the ground floor and basement level 1, and the enhancement of the monumental staircase.


For my part, I worked on the design of this project in two periods. I was first responsible for fully building the digital model of the existing building from the surveyor's measurements. We were then in the APS phase. Then, at the end of the APD phase, I took over the overall management of the project, with the goal at that time of obtaining the building permit. It was successfully obtained at the end of 2023.